anthropics/claude-for-legal2 files

Renewal Tracker

>

Specification
Skill ID
anthropics/claude-for-legal/renewal-tracker
Publisher
anthropics
Repository
claude-for-legal
Installs
0
Files
2
Synced
Sep 23, 2026
How to use it

Open any RiverX project, open the Skills panel in the chat, and search for this identifier. The files are fetched from the source repository at install time.

anthropics/claude-for-legal/renewal-trackerInstalls these files
  • SKILL.md
  • references/renewal-register.yaml

What this skill tells the agent

/renewal-tracker

Surfaces what's renewing and when you have to cancel by.

Instructions

  1. Read `~/.claude/plugins/config/claude-for-legal/commercial-legal/renewal-register.yaml` (the config directory — survives plugin updates).
  1. Default mode: Mode 2 — what's coming up in the next 90 days, grouped by urgency using half-open intervals so each deadline lands in exactly one band: 🔴 0–13 days, 🟠 14–44 days, 🟡 45–89 days. Days 14, 45, and 90 are boundaries — each belongs to exactly one band, not two.
  1. `--days N`: Change the window.
  1. `--missed`: Mode 4 — cancel-by deadlines that passed without recorded cancellation.
  1. If register is empty and the [CLM] is connected: Offer Mode 3 — scan the [CLM] for active agreements with renewal dates and bulk-load.
  1. Output includes recommended actions: who to ping (the business owner from each register entry), which ones have uncapped pricing (get leverage before window closes).

Examples

/commercial-legal:renewal-tracker
/commercial-legal:renewal-tracker --days 180
/commercial-legal:renewal-tracker --missed

Purpose

Nobody reads a contract twice. The renewal date is extracted once, at review time, and then it lives somewhere — ideally somewhere that shouts at you 45 days before the cancel-by deadline, not 45 days after.

This skill maintains the renewal register and surfaces what's coming.

The register

Lives at ~/.claude/plugins/config/claude-for-legal/commercial-legal/renewal-register.yaml (the config directory — survives plugin updates). Each entry:

- counterparty: "Acme SaaS Inc."
  agreement: "Acme Platform Subscription Agreement"
  signed_date: 2025-06-15
  initial_term_end: 2026-06-15
  current_term_end: 2026-06-15     # rolls forward after each auto-renewal; compute cancel_by_* from this
  renewal_mechanism: "auto-renew annual"
  notice_period_days: 60
  notice_method: "email"           # email / portal / certified mail / registered post / courier / per contract §X
  transit_buffer_days: 0           # 0 for electronic, 5 for domestic certified mail, 10 for international registered post — or per contract if specified
  cancel_by_calendar: 2026-04-16    # current_term_end minus notice_period_days
  cancel_by_effective: 2026-04-16   # rolled back to last business day if needed
  send_by_effective: 2026-04-16    # cancel_by_effective minus transit_buffer_days — the date you must SEND the notice
  cancel_by_roll_note: ""           # e.g., "rolled back from Sunday 2026-11-01; verify against contract's business-day definition"
  cancel_by_provenance: "[model calculation — verify against the notice clause]"
  price_on_renewal: "then-current list (uncapped)"
  annual_value: 48000
  business_owner: "jane@company.com"
  clm_id:        "IC-12345"        # if connected
  docusign_envelope: "abc-123"   # if connected
  status: "active"               # active | cancelled | renewed | lapsed
  notes: "Pricing uncapped — revisit before renewal. Alt vendors: X, Y."

Notice transit time — alert off `send_by_effective`, not `cancel_by_effective`. A 60-day window with a certified-mail requirement is really ~55 days. The tracker that alerts on the received-by date is the tracker that misses the deadline. Compute send_by_effective = cancel_by_effective - transit_buffer_days and fire alerts (the 🔴 / 🟠 / 🟡 urgency bands in Mode 2) off send_by_effective. Mode 2's urgency column shows send_by_effective; a detail column surfaces cancel_by_effective, notice_method, and transit_buffer_days so the reader can see the delta and challenge the buffer.

Rolling renewals — the register that doesn't roll forward is the register that's right once. Store initial_term_end for the record, but compute cancel_by_* from current_term_end. When a renewal fires (the cancel window passes and no notice was given), prompt:

This contract auto-renewed on [date]. Update the register: new current_term_end is [date + renewal period], new cancel_by_effective is [computed], new send_by_effective is [computed]. Confirm?

After year one, initial_term_end is wrong and only current_term_end produces a correct cancel-by date.

Business-day check on every cancel-by date

The register's cancel-by date must be the last BUSINESS DAY on which notice is effective, not the calendar date. A calendar date that falls on a weekend is the single most common way a renewal deadline gets missed. The register catches it.

When you compute (or ingest) a cancel-by date:

  1. Compute the calendar date. cancel_by_calendar = initial_term_end − notice_period_days (or whatever the clause specifies). This is the raw arithmetic.
  2. Business-day roll-back keyed to governing law. The contract's governing law determines which holidays count. US: federal holidays + the state's holidays if governing law is a state. England & Wales: bank holidays. Germany: Feiertage (vary by Bundesland — ask which). Canada: federal + provincial. Singapore: public holidays. If Saturday, roll back to Friday. If Sunday, roll back to Friday. If a holiday in the governing-law jurisdiction, roll back to the prior business day. Roll BACK, never forward — forward means notice arrives after the window closes. For non-US governing law, if you can't determine the holiday calendar, flag it: "Governing law is [X] — business-day roll-back uses US federal holidays as a placeholder. Verify against the [jurisdiction] holiday calendar before relying on the effective date."
  3. Check the contract's own day-counting rule. Look for "business day," "received by," "deemed received," "5:00 p.m. [local time]," or a notice-method clause. If the contract defines "business day" or specifies receipt mechanics (certified mail, email with read receipt), that definition controls. Flag any mismatch between the default roll-back and the contract's own rule.
  4. Record BOTH dates in the register. cancel_by_calendar is the raw arithmetic; cancel_by_effective is the last business day on which notice is effective; cancel_by_roll_note records why they differ (e.g., "rolled back from Sunday 2026-11-01; verify against contract's business-day definition"). Every computed cancel_by_effective carries a cancel_by_provenance tag of [model calculation — verify against the notice clause] so the verify flag travels with the date, not with the surrounding prose.
  5. Fire alerts off the EFFECTIVE date, not the calendar date. Urgency bands (🔴 / 🟠 / 🟡 in Mode 2) use cancel_by_effective. Mode 2 output shows cancel_by_effective in the urgency column and surfaces cancel_by_calendar and cancel_by_roll_note in a detail column where the roll-back happened, so the reader can see it and challenge it.

A Mode 2 report that prints cancel_by: 2026-11-01 (a Sunday) with no weekday and no warning is a silently wrong effective deadline. The register is the place to catch it — once, at ingest — not later, when the window has already moved.

Modes

Mode 1: Ingest a renewal (handoff from review)

When saas-msa-review or vendor-agreement-review finds a renewal clause, it hands off a record. Append it to the register. If the counterparty already has an entry, ask whether this is a replacement (renewed agreement) or an additional agreement.

Mode 2: What's coming up

Default lookback window: next 90 days.

Urgency bands are half-open intervals — a deadline lives in exactly one band. Use days-until-cancel-by (cancel_by_effective - today). Day 14, 45, and 90 each belong to exactly one band, not two; an off-by-one here puts the most-urgent items into the less-urgent bucket.

  • 🔴 0–13 days (cancel-by in less than 14 days — including today)
  • 🟠 14–44 days
  • 🟡 45–89 days
  • (everything 90+ days is outside the default lookback window; include only if the user passed --horizon beyond 90)
## Renewals — next 90 days

### 🔴 Cancel-by deadline in 0–13 days

Use this skill in a project

Open any RiverX project, search the Skills panel for anthropics/claude-for-legal/renewal-tracker, and install it in one click.

Use this skill