daymade/claude-code-skills9 files

QA Expert

This skill should be used when establishing comprehensive QA testing processes for any software project. Use when creating test strategies, writing test cases following Google Testing Standards, executing test plans, tracking bugs with P0-P4 classification, calculating quality metrics, or generating progress reports. Includes autonomous execution capability via master prompts and complete documentation templates for third-party QA team handoffs. Implements OWASP security testing and achieves 90% coverage targets.

Specification
Skill ID
daymade/claude-code-skills/qa-expert
Publisher
daymade
Repository
claude-code-skills
Installs
0
Files
9
Synced
Sep 23, 2026
How to use it

Open any RiverX project, open the Skills panel in the chat, and search for this identifier. The files are fetched from the source repository at install time.

daymade/claude-code-skills/qa-expertInstalls these files
  • SKILL.md
  • assets/templates/TEST-CASE-TEMPLATE.md
  • references/day1_onboarding.md
  • references/google_testing_standards.md
  • references/ground_truth_principle.md
  • references/llm_prompts_library.md
  • references/master_qa_prompt.md
  • scripts/calculate_metrics.py
  • scripts/init_qa_project.py

What this skill tells the agent

QA Expert

Establish world-class QA testing processes for any software project using proven methodologies from Google Testing Standards and OWASP security best practices.

When to Use This Skill

Trigger this skill when:

  • Setting up QA infrastructure for a new or existing project
  • Writing standardized test cases (AAA pattern compliance)
  • Executing comprehensive test plans with progress tracking
  • Implementing security testing (OWASP Top 10)
  • Filing bugs with proper severity classification (P0-P4)
  • Generating QA reports (daily summaries, weekly progress)
  • Calculating quality metrics (pass rate, coverage, gates)
  • Preparing QA documentation for third-party team handoffs
  • Enabling autonomous LLM-driven test execution

Quick Start

One-command initialization:

python scripts/init_qa_project.py <project-name> [output-directory]

What gets created:

  • Directory structure (tests/docs/, tests/e2e/, tests/fixtures/)
  • Tracking CSVs (TEST-EXECUTION-TRACKING.csv, BUG-TRACKING-TEMPLATE.csv)
  • Documentation templates (BASELINE-METRICS.md, WEEKLY-PROGRESS-REPORT.md)
  • Master QA Prompt for autonomous execution
  • README with complete quickstart guide

For autonomous execution (recommended): See references/master_qa_prompt.md - single copy-paste command for 100x speedup.

Core Capabilities

1. QA Project Initialization

Initialize complete QA infrastructure with all templates:

python scripts/init_qa_project.py <project-name> [output-directory]

Creates directory structure, tracking CSVs, documentation templates, and master prompt for autonomous execution.

Use when: Starting QA from scratch or migrating to structured QA process.

2. Test Case Writing

Write standardized, reproducible test cases following AAA pattern (Arrange-Act-Assert):

  1. Read template: assets/templates/TEST-CASE-TEMPLATE.md
  2. Follow structure: Prerequisites (Arrange) → Test Steps (Act) → Expected Results (Assert)
  3. Assign priority: P0 (blocker) → P4 (low)
  4. Include edge cases and potential bugs

Test case format: TC-[CATEGORY]-[NUMBER] (e.g., TC-CLI-001, TC-WEB-042, TC-SEC-007)

Reference: See references/google_testing_standards.md for complete AAA pattern guidelines and coverage thresholds.

3. Test Execution & Tracking

Ground Truth Principle (critical):

  • Test case documents (e.g., 02-CLI-TEST-CASES.md) = authoritative source for test steps
  • Tracking CSV = execution status only (do NOT trust CSV for test specifications)
  • See references/ground_truth_principle.md for preventing doc/CSV sync issues

Manual execution:

  1. Read test case from category document (e.g., 02-CLI-TEST-CASES.md) ← always start here
  2. Execute test steps exactly as documented
  3. Update TEST-EXECUTION-TRACKING.csv immediately after EACH test (never batch)
  4. File bug in BUG-TRACKING-TEMPLATE.csv if test fails

Autonomous execution (recommended):

  1. Copy master prompt from references/master_qa_prompt.md
  2. Paste to LLM session
  3. LLM auto-executes, auto-tracks, auto-files bugs, auto-generates reports

Innovation: 100x faster vs manual + zero human error in tracking + auto-resume capability.

4. Bug Reporting

File bugs with proper severity classification:

Required fields:

  • Bug ID: Sequential (BUG-001, BUG-002, ...)
  • Severity: P0 (24h fix) → P4 (optional)
  • Steps to Reproduce: Numbered, specific
  • Environment: OS, versions, configuration

Severity classification:

  • P0 (Blocker): Security vulnerability, core functionality broken, data loss
  • P1 (Critical): Major feature broken with workaround
  • P2 (High): Minor feature issue, edge case
  • P3 (Medium): Cosmetic issue
  • P4 (Low): Documentation typo

Reference: See BUG-TRACKING-TEMPLATE.csv for complete template with examples.

5. Quality Metrics Calculation

Calculate comprehensive QA metrics and quality gates status:

python scripts/calculate_metrics.py <path/to/TEST-EXECUTION-TRACKING.csv>

Metrics dashboard includes:

  • Test execution progress (X/Y tests, Z% complete)
  • Pass rate (passed/executed %)
  • Bug analysis (unique bugs, P0/P1/P2 breakdown)
  • Quality gates status (✅/❌ for each gate)

Quality gates (all must pass for release): | Gate | Target | Blocker | |------|--------|---------| | Test Execution | 100% | Yes | | Pass Rate | ≥80% | Yes | | P0 Bugs | 0 | Yes | | P1 Bugs | ≤5 | Yes | | Code Coverage | ≥80% | Yes | | Security | 90% OWASP | Yes |

6. Progress Reporting

Generate QA reports for stakeholders:

Daily summary (end-of-day):

  • Tests executed, pass rate, bugs filed
  • Blockers (or None)
  • Tomorrow's plan

Weekly report (every Friday):

  • Use template: WEEKLY-PROGRESS-REPORT.md (created by init script)
  • Compare against baseline: BASELINE-METRICS.md
  • Assess quality gates and trends

Reference: See references/llm_prompts_library.md for 30+ ready-to-use reporting prompts.

7. Security Testing (OWASP)

Implement OWASP Top 10 security testing:

Coverage targets:

  1. A01: Broken Access Control - RLS bypass, privilege escalation
  2. A02: Cryptographic Failures - Token encryption, password hashing
  3. A03: Injection - SQL injection, XSS, command injection
  4. A04: Insecure Design - Rate limiting, anomaly detection
  5. A05: Security Misconfiguration - Verbose errors, default credentials
  6. A07: Authentication Failures - Session hijacking, CSRF
  7. Others: Data integrity, logging, SSRF

Target: 90% OWASP coverage (9/10 threats mitigated).

Each security test follows AAA pattern with specific attack vectors documented.

Day 1 Onboarding

For new QA engineers joining a project, complete 5-hour onboarding guide:

Read: references/day1_onboarding.md

Timeline:

  • Hour 1: Environment setup (database, dev server, dependencies)
  • Hour 2: Documentation review (test strategy, quality gates)
  • Hour 3: Test data setup (users, CLI, DevTools)
  • Hour 4: Execute first test case
  • Hour 5: Team onboarding & Week 1 planning

Checkpoint: By end of Day 1, environment running, first test executed, ready for Week 1.

Autonomous Execution (⭐ Recommended)

Enable LLM-driven autonomous QA testing with single master prompt:

Read: references/master_qa_prompt.md

Features:

  • Auto-resume from last completed test (reads tracking CSV)
  • Auto-execute test cases (Week 1-5 progression)
  • Auto-track results (updates CSV after each test)
  • Auto-file bugs (creates bug reports for failures)
  • Auto-generate reports (daily summaries, weekly reports)
  • Auto-escalate P0 bugs (stops testing, notifies stakeholders)

Benefits:

  • 100x faster execution vs manual
  • Zero human error in tracking
  • Consistent bug documentation
  • Immediate progress visibility

Usage: Copy master prompt, paste to LLM, let it run autonomously for 5 weeks.

Adapting for Your Project

Small Project (50 tests)

  • Timeline: 2 weeks
  • Categories: 2-3 (e.g., Frontend, Backend)
  • Daily: 5-7 tests
  • Reports: Daily summary only

Medium Project (200 tests)

  • Timeline: 4 weeks
  • Categories: 4-5 (CLI, Web, API, DB, Security)
  • Daily: 10-12 tests
  • Reports: Daily + weekly

Large Project (500+ tests)

  • Timeline: 8-10 weeks
  • Categories: 6-8 (multiple components)
  • Daily: 10-15 tests
  • Reports: Daily + weekly + bi-weekly stakeholder

Reference Documents

Access detailed guidelines from bundled references:

  • `references/day1_onboarding.md` - 5-hour onboarding guide for new QA engineers
  • `references/master_qa_prompt.md` - Single command for autonomous LLM execution (100x speedup)
  • `references/llm_prompts_library.md` - 30+ ready-to-use prompts for specific QA tasks
  • `references/google_testing_standards.md` - AAA pattern, coverage thresholds, fail-fast validation
  • `references/ground_truth_principle.md` - Preventing doc/CSV sync issues (critical for test suite integrity)

Assets & Templates

Use this skill in a project

Open any RiverX project, search the Skills panel for daymade/claude-code-skills/qa-expert, and install it in one click.

Use this skill